Rite Solution
Raj Nagar, Ghaziabad, Uttar Pradesh
GST No. 09DVXPS7155D1ZQ
TrustSEAL Verified
Call 0804897618274% Response Rate
SEND EMAIL
 

Lifting And Lowering Equipment

Wholesale Distributor of a wide range of products which include slab lifting tong.

Slab Lifting Tong

Slab Lifting Tong
  • Slab Lifting Tong
Get Best Quote
Approx. Price: Rs 2 Lakh / PieceGet Latest Price

Product Details:

Minimum Order Quantity1 Piece
ColorYellow
Finishing TypeSmooth
MaterialMS plate and I Beam
Model Name/NumberRS-SLT
Size/Capacity2 Ton-35 Ton
LengthAs per customer Need
Usage/ApplicationTo Lift Slab of Various Size.
WeightAs per Capacity.

The Automatic Slab Tong is designed to lift either one or several slabs simultaneously, in a horizontal position. 
The tongs are robustly engineered for heavy duty application to meet the severe demands of steel mills.

The crane operator controls the entire lifting process from the crane cabin by placing the tong above the center of the slab. 
The suspension assembly is designed to accommodate standard crane hooks.
The suspension is fixed by pull pins. Customized suspensions produced on request.

The Hoist operated Slab Tong is designed to lift either one or several slabs simultaneously, in a horizontal position. The tongs are robustly engineered for heavy duty application to meet the severe demands of steel mills. 
The prepositioning of the scissors is actuated by the hoist on the slab tong. 
The crane operator controls the entire lifting process from the crane cabin by placing the tong above the center of the slab. The drive of the hoist is actuated by a three-phase motor. 
The electrical circuit to the control box is carried out by plug-in connection. This enables quick removal of the tong from the crane.
The standard suspension assembly is designed to accommodate standard crane hooks. The standard suspension is fixed by pull pins.

The Dragline operated Slab Tong is designed to lift either one or several slabs simultaneously, in a horizontal position. 
The tongs are robustly engineered for heavy duty application to meet the severe demands of steel mills.

The crane operator controls the entire lifting process from the crane cabin. 
The preposition of the scissors is actuated by the hoist on the crane trolley.

 

The suspension assembly is designed to accommodate standard crane hooks. The suspension is fixed by pull pins. 
Customized suspensions produced on request.

Request
Callback


Additional Information:

  • Production Capacity: 3 in a month
  • Delivery Time: 3 Weeks
  • Packaging Details: Yes
Yes! I am Interested
X

Product Videos

Watch More Videos

Explore More Products

View All Products




Reach Us
Ajeet Pratap Singh (Proprietor)
Rite Solution
G- 79, Devika Chamber, District Center, RDC
Raj Nagar, Ghaziabad - 201001, Uttar Pradesh, India


Call Us


Send E-mail